General
873 results found
-
1 vote
-
Board templates
To help board setups be a lot easier, we should be able to see more examples of how people set them up
1 vote -
Automatically upload estimates during dispute
To help the dispute process be more seamless
1 vote -
Automatically make job during import
when importing a contact it should also make a job to save time
1 vote -
Customizable Lead Source
It would be nice if we could create a more customizable Lead Source option. A drop down when selecting referral so we can say who. This could tell me this % of leads came from State Farm but of that this % came from John Deer Directly. I would like to be able to manually enter a referral if it is not in the options list so at the end of the year we discover Mike Sour sent us 30 leads, we should send him a thank you.
1 vote -
Sample layout in layout library for CertainTeed Siding Monogram
Currently, there is a sample layout in the layout library for CertainTeed Siding American Legend, but it would be great if there were a sample layout in the layout library for CertainTeed Siding Monogram.
1 vote -
Add More customization to the Job Information
Add More customization to the job information. This would help to be able to have fields listed under the job information. Being able to select where the fields show on the job and under the information would be helpful.
1 vote -
5 votes
-
1 vote
-
Having separate measurement token for multiple buildings within the same job to allow for multiple quotes within one estimate for different
Having separate measurement token for multiple buildings within the same job to allow for multiple quotes within one estimate for different projects.
1 vote -
1 vote
-
Able to manually send the SumoQuote quote sent webhook
For instances where the Webhook doesn't trigger automatically
1 vote -
Remove years from financing
We give a line of credit and can't have any years there
1 vote -
1 vote
-
Gold Star Taken Away
The gold star next to "Job sidebar" gets in the way, can it just be removed?
2 votes -
Separate Labor & Material Cost permissions on Work Orders
Currently, work orders display both labor and material costs together. Users need the ability to show subcontractors only the labor cost without revealing material costs. Adding an option to separate these fields would improve flexibility in cost transparency.
1 vote -
Automatic Job synopsis
If you open up an old job downloading all the documents, (getting rid of the photos), and reading through everything can take a few hours. We would like to have the job automatically show the scope of work based off those documents
1 vote -
apple pencil support
would like the ability to log notes with apple pencil, as well as annotate photos and capture signatures
1 vote -
Add hyperlink to the "Inspection Section" in the app for NSE
Would like the ability to have the hyper-link option in the app version of the inspection section in New Sales Experience.
1 vote -
3 votes
- Don't see your idea?