Create A Separate Summary of Markup vs Additional Markup
I'd like to be able to use the main line item markup section as overhead recovery, then have additional markup on top of that. This would be atainable with a workaround if the estimate breakdown showed the line item markup as a separate subtotal before the additional markup.
1
vote
