Skip to content

JobNimbus Feedback

Have suggestions for how we can improve? Share them in the categories, or vote for the ideas you like best. We want to hear your feedback!

Please only include one suggestion per post. While we can't respond to every suggestion, we are committed to reviewing every suggestion individually.

Financials

  • Hot ideas
  • Top ideas
  • New ideas
  • My feedback

537 results found

  1. The ability to remove photos from NSE Estimate Inspection page directly

    Work around is to remove the photo from the job, however removing the photo from the estimate page if needed instead of the job would be useful.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. Allowing a manually logged payment to apply to a specific split payment in an invoice

    Currently, if you log a payment manually and apply it to an invoice that has scheduled payments at different stages or progress through a job, you can select which split payment to apply it to. On the invoice, it will remove the split payment name of "deposit," for example, and only say "payment" with the date. Overall, it looks kind of rough and confused for a customer, especially since the customer has access to this invoice.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Invoices  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. 2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    1 comment  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. Have Classic Reports for Estimates route you the NSE Layout not the Legacy Layout

    Customer would like to be able to use the reports to route to the NSE Estimate instead of routing to the Legacy Estimate when clicking the link provided in the reports.

    Currently links in Estimate Reports takes you to the Legacy layout for the estimate and if you choose to edit it takes you to edit in the legacy settings. It would be helpful to route to the NSE settings for consistency in the settings.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. AI Tool for Calendar and Financial Documents

    Customer would like AI Tools to be incorporated to tell it to add to calendar and or create work orders or submit material purchases

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Turn off estimate emails

    I would like the option to turn off the email requesting the down payment when marking an estimate as signed. We have some customers that come in and physically sign a copy of the estimate and when I go into the new estimates and mark it signed it automatically sends out an email and requests a down payment even though they have made the payment. This has become confusing for our customers as they think that we have lost their payments.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Copy Estimate Sections to Estimate Tabs

    It would be ideal to have the option to Copy estimate section details & line items to a new tab instead of having to recreate a bunch of line items on each tab (good, better, best tabs).

    4 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. Profit Tracker in-depth breakdowns

    Profit tracker gives you a data table or graph, quite often, to represent the data pulled from different profit trackers on the jobs themselves. If you could click on a specific data field in the profit tracker insights page and see a breakdown, or even simply a link that will take you directly to the job the data is associated would save so much time when browsing the data and checking and validating that it is legit.

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. No email required for signing estimates

    This user does not email their customers and would like the option to omit the email address when marking an estimate as signed

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. manually enter estimate price

    Ability to adjust the price of the estimate without going line by line

    2 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. Add "Roof Load" to Delivery Options on Material Orders (QXO/Beacon)

    Most of our jobs (around 90%) require materials to be loaded directly onto the roof. Currently, the Shipping Method dropdown only includes “PICKUP” and “GROUND DROP.” We're forced to manually type "Please ROOFLOAD" into the Note to Supplier field, which risks being forgotten and could result in incorrect delivery.

    We’d like “ROOF LOAD” added as a selectable Shipping Method so it can be consistently applied and communicated to suppliers. This option is already available when ordering through QXO, so we hope it can be added similarly in JobNimbus.

    6 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. New Sales Experience Estimates with Financing Options in "Months"

    Currently when inputting a custom financing option from estimate settings, the system will only let me choose years. This is problematic because if I offer 18 month financing, I'd have to input 1.5 years, but the system won't accept decimal points. So having the option of including "months" instead of "years" would be good for offering that kind of financing if decimals cannot be included (18 months instead of 1.5 years)

    7 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    4 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. Option to enter in Subtotal on Estimates

    To be able to manually type in subtotal on estimates for insurance purposes.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. Estimate reply to not go to external email

    When an estimate is sent, and a customer replies to that email, it goes to the user's external email instead of JN. Would like settings to control this

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  16. Show Materials Listed w/ Quantities for Better/Best options

    Right now when someone chooses the better or best option, we can only see materials listed with no quantities. It does not show us the amount of materials listed on the ordering section once the contract has been signed as they selected one of the options that includes everything from the previous selection (good, better, best).

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. 1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Creating Material Order - SLOW

    Goodness, when you create a material order and it's integrated to a supplier, it goes slow as molasses, like you're running an old computer. If you have to create a material order from scratch or start with a material order template, it makes the process take a LOT longer than it should. Very slow...need speed.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Linked Job Name Not Updating in Budget

    When the job name is changed, the linked job name in the budget does not update automatically and continues to reference the old job name. Additionally, the system does not allow manual correction of the linked job name. To ensure accurate reporting and reduce confusion, the system should either automatically update the linked job name in the budget or provide users with the ability to manually update it as needed.

    1 vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. Converting a draft estimate to a material order

    The ability to convert an estimate that is in draft status to a material order.

    3 votes

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We’ll send you updates on this idea

    0 comments  ·  Estimates  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
1 2 6 8 10 26 27
  • Don't see your idea?